We have compiled a list of manufacturers, distributors, product information, reference prices, and rankings for Basic inspection hatch.
ipros is IPROS GMS IPROS One of the largest technical database sites in Japan that collects information on.

Basic inspection hatch - List of Manufacturers, Suppliers, Companies and Products

Basic inspection hatch Product List

1~2 item / All 2 items

Displayed results

Kiso inspection opening (retrofit type)

Installation is possible after the foundation is laid! A new standard component essential for airtight insulation in bathroom sections.

The "Kiso Inspection Opening (Retrofit Type)" is a foundation construction material characterized by its easy installation and flexible timing for attachment. Equipped with airtight material, it ensures airtight insulation in the human access area. After inspection, closing the lid allows for the maintenance of airtight insulation in the bathroom area, just as it was before the inspection. Additionally, it can be opened and closed easily multiple times, making inspections of the bathroom area straightforward.

  • others

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

【Bathroom area】 Kiso inspection opening

Even after inspection, the insulation and airtightness remain the same. An essential item for the bathroom area.

The Kiso inspection opening is the optimal item to be installed under the bathrooms of long-term excellent housing and next-generation energy-efficient homes. The inspection opening itself has insulation performance, and since the opening and closing lid is equipped with airtight material, its insulation and airtightness remain unchanged no matter how many times it is opened and closed. Even after repeatedly inspecting the bathroom section, its performance does not deteriorate. Installation is also easy; it can simply be set in the formwork in advance during the concrete pouring for the rise. *There is also a "pipe-compatible type" that allows for drilling holes for piping.

  • others

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration